Design, Install, of the Control Panel for "RAMEDA 6th OCTOBER FACTORY"
Sanitary and Industrial Wastewater Treatment
Station.
The System is Composed of two stations (Sanitary Wastewater Treatment Station and Industrial Wastewater Treatment
Station).
Each Station can be operated fully automatic or manually through the SCADA system independent from the other station.
All the Pumps are Operated through DOL Starters using siemens motor starters and contactors.
Each Tank in the station is equipped with a pressure sensor to measure the level inside the tanks.
The Treated Water Pumps and the Backwash Pumps operation is alternating according to timer setpoints in the SCADA system
settings pages.
The Valves operation is alternating between production or backwash according to timer setpoints in the SCADA system
settings pages.